If you read my blog regularly, you know that the organization, Give Kids the World Village is dear to my heart. The work they do for children with life-threatening illnesses is so important to not only the children, but the families as well. This week they began work on 88 of the villas which are home base for the children when they visit the village.
With the help of Wyndham Vacation Ownership (WVO), these villas will be transformed in the period of two weeks. Sound impossible? Not for the team at Give Kids the World Village! As of January 12th, they have been working non-stop (yes, 24 hours a day!) to create a new experience for the children and families that will come to visit. With the renovation cost of $60,000 for each villa, Give Kids the World can definitely use whatever help you can offer!
Can’t afford to help out financially at this point? If you are local to the area, or have a way of getting materials to them, they are also accepting donations of that kind. Are you a fix-it person or just someone who loves to help in whatever way you can? You can visit their page and find out how you can donate your time and service to help this worthwhile cause. Here is a short list of their needs:
- General contractors
- Demolition services
- Drywall materials, repairs
& installation services - Millwork services
- Tile services
- Carpenters
- Electricians
- Plumbers
- Painters
- Counter top installers
- Glass/mirror installers
- Concrete & forming installers
- Framing installers
- Pressure washers
- General laborers
- Reprographics/Large print services
- Specified finishes & fixtures (specs available from GKTW)
- Lumber
- General building materials/supplies
This is not a small undertaking. This is not just a simple renovation where they are going to make a few changes and put some nice furnishings in the villas. This is a massive reno event. Just check out all the things they are doing to transform these villas!
Fairytale Forest
Exterior
- Secure/replaced painted shingles
- Paint exterior
- Add wiring and bollards
Dining room
- Remove all floor tiles
- Remove and replace all cabinets
- Install new counter tops
- Install new tile on floors and backsplash
- New plumbing and fixtures
- Plantation shutters
- Install new appliances
- Paint
Living room
- Crown molding (living room only)
- Remove tile
- Install new tile
- Paint
- New tile and tile baseboard
- Install FF&E and Art
- New ceiling fans
- New outlets and switches
Kid’s bedroom
- Remove carpet and replace with carpet tile
- New paint
- Add lights 4
- Plantation shutters
- New ceiling fan
- Laminate cube new colors
- All new FF&E
Kid’s bathroom
- Demo all except whirlpool
- Demo shower
- New tile throughout
- New vanities and cabinets with variable height
- New plumbing
- New tile throughout
- New grab bars
- Electric mirrors 2
- Remove medicine cabinet and repair wall
Hallway
- Demo tile
- New tile
- Paint
- New appliances in laundry
Parent’s bathroom
- Demo all
- Remove tub and replace with shower
- New vanities and countertops
- New grab bars
- Install Electric lit mirror
- Remove medicine cabinet and repair wall
- All new plumbing
- Paint
- New tile (non skid floor)
Parents’ bedroom
- Demo Carpet
- Remove mirrored closet doors and replace w 6 panel
- New ff&e and art
- New paint
- New ceiling fan
- Install plantation shutters
- Install new carpet
Phase 2
Exterior
- Repair and Enhance Elevations Replace wood, repair stucco and dryvit
- Landscape
- Paint exteriors update colors
- Stamped concrete porches
- Replace or paint soffit
- New screens
Dining room
- Correct elevation at threshold
- Demo all cabinets and bar area
- Correct area over sink
- Add new lights
- Install new counter tops
- Install new cabinets
- Install new tile on floors and backsplash
- New plumbing and fixtures
- Plantation shutters
- Install new appliances
- Revamp sprinklers, replace heads
- Paint
Living room
- Remove tile?
- Install new tile
- Repair walls and texture
- New paint
- New 6 panel doors
- Add 4 new lights
- Install FF&E and Art
- New ceiling fans
- New outlets and switches
Kid’s room
- Remove carpet and replace
- Demo border and repair walls
- texture as needed
- paint
- New cubes
- Replace hot water heaters
- New paint
- Add lights 4
- Plantation shutters
- New ceiling fan
- All new FF&E
- Remove and replace closet doors with 6 panel swing
Kid’s bathroom
- Demo all except whirlpool (several will have to be replaced as they are made from marcraft composite)
- New tile throughout
- Additional light over shower
- New vanities and cabinets with variable height
- New plumbing
- New grab bars (as needed)
- Install electric mirrors 2
- Remove medicine cabinet and patch
- Texture as needed
- New exhaust fans
- New FF&E (Owner provided)
Hallway
- New doors on laundry and AC closet 6 panel
- Paint
- New appliances in laundry
Parent’s bathroom
- Demo all
- Remove tub and replace with shower
- New vanities and countertops
- New grab bars
- Electric light mirror
- Remove medicine cabinet and repair wall
- Texture as needed
- New plumbing
- Paint
- New tile (non skid floor)
Parents’ bedroom
- Demo Carpet
- Remove mirrored closet doors and replace w 6 panel
- New ff&e
- New paint
- New ceiling fan
- Install plantation shutters
- Install new carpet
- New Art
- FF&E
Remember, this is all going to be completed in 2 WEEKS! They need your help to have this dream come to fruition. To find out how you can help, please visit Give Kids the World Extreme Village Makeover.
If you want to know more about the amazing work they do at the Village, please check out my 3 part series!
You can also helo by sharing this post, tweeting about it or sharing on your Facebook page! Together, we can make a difference in the lives of children!